Winter rebuild 4
Posted: Sat Feb 08, 2014 9:23 am
One of the most fidliest jobs I find is during the grinding-in process of the valves, assembling and checking and re-assembling/re-checking...those collets are a bugger...and I'd rather only do it the once...well I've found a solution
Stainless spring steel strips ( I bought 10 for ?5..made a mess of two of them,)
http://www.ebay.co.uk/itm/221204150023? ... 1497.l2649
straighten them out (that's where two of them broke),angle grinder cuts a slot just wide enough to fit the valve stem cut-outs
fit one,then the other
and then lock them together with a little folded aluminium
All eight done...
Fill with whatever you fancy and leave to stand (looks like I'll have to look at No2 again..)
John
Stainless spring steel strips ( I bought 10 for ?5..made a mess of two of them,)
http://www.ebay.co.uk/itm/221204150023? ... 1497.l2649
straighten them out (that's where two of them broke),angle grinder cuts a slot just wide enough to fit the valve stem cut-outs
fit one,then the other
and then lock them together with a little folded aluminium
All eight done...
Fill with whatever you fancy and leave to stand (looks like I'll have to look at No2 again..)
John